Florida Power &
Light 500kV 90° Dead-End Structure Replacement This
project consisted of replacing the weakened 3 steel poles with
40,000 lb. concrete structures. With limited access and an
aggressive schedule, Winco was able to complete this project in five
days, the first of its kind on FPL’s 500kV transmission system.
Florida Power &
Light Insulator
Replacements Entire 500kV Transmission Line System Winco
has a been working with FPL every spring for the past six years now,
performing heavy glass insulator change- outs. To date, Winco has
changed- out insulators on over 1,000 towers in FPL’s 500kV
transmission system.
PAR – Jacksons Ferry 765kV Wyoming –
Jacksons Ferry 765kV Transmission Line Winco was selected to
provide helicopter support operations for this landmark project in
West Virginia, one of the longest and most challenging 765kV lines
in the country. Winco helped their client alleviate some of the
challenges imposed on them by the rough terrain in the area.
IFS – Path 15 500kV Path 15: Los Banos –
Gates 500kV Transmission Line Winco has worked with InfraSource
companies for over a decade on several projects, including the
largest and one of the most anticipated projects in previous years,
Path 15. Winco assisted in many of the phases of the construction
process on this project, and was an integral component of the
contractor being able to meet the compressed construction
schedule.
Florida Power & Light Hurricane
Restoration Various Transmission Lines Winco has a proven
ability to be a first responder when disasters such as the hurricane
season of 2005 occur. Within 5 hours of Hurricane Wilma’s track
over Florida, Winco had a helicopter and crew assessing the damage
and assisting FPL with first response plan and power restoration
activities. |